伊人22综合网图片-欧美性猛交 XXXX 乱大交-四虎永久在线精品免费观看视频-久久这里只有是精品23-热久久视久久精品18-国产观看免费高清电视剧推荐-色五-国产人妻人伦精品九色威尼斯商人

News

Membrane structure drainage problem resolution

Share:
Hits: 1717 Publication time: 2018-12-05 SML

Landscape membrane structure as the outdoor landscape architecture, natural need to consider the load and stress distribution under various climate conditions. Due to the membrane material is a new kind of building materials, flexible it has a certain scale, the membrane surface under the action of load, there will be some deformation, so the landscape membrane structure architecture to "rain" and "snow" is more sensitive. Membrane structure of architectural design and structural design stage must be fully aware of the "water" and "snow" problem. Otherwise, leave a lot of hidden dangers. Past a lot of landscape membrane structure engineering accident, this problem is one of the main cause of the accident.



From the concrete operating level, the landscape design of membrane structure should be used according to the structure of the characteristics and general layout requirements, reasonable slope drainage and drainage position, ensure catchment is smooth at the membrane surface; In snow load larger areas, should adopt the larger slope at the membrane surface and the necessary snow prevention measures.


Landscape drainage design of membrane structure can be used without drainage or organized drainage way. Because of his strange landscape of the modelling of membrane structure, free surface, the reasonable way of modelling and drainage should be considered.


Large public membrane structure architecture (more than 3000 ㎡), should adopt organized drainage; Small open membrane structure architecture (below 500 ㎡) can take disorganized drainage; Medium-sized public buildings (500 ~ 3000 ㎡) membrane appropriate according to its height, closed and open sex, select the appropriate drainage form, can be partly free drainage, drainage combined with organization.


The rain water at the membrane surface is designed on the basis of the drainage system, its size and the degree of the local rainstorm q, the catchment area of A proper drainage capacity coefficient k and the membrane surface, according to the following formula

Qr = k1 (A.q 5/1000)

Type of qr - rain design flow

A - catchment area (㎡), based on the characteristics of the membrane surface calculation;

Q5 - local rainfall duration rainstorm intensity of 5 min

K1 - design return period is 1 a appropriate drainage capacity coefficient of the membrane surface (slope at the membrane surface is less than 10% when desirable k1 = 1.0, when the slope is greater than 10% in 1.2 ~ 2.0).

The rainstorm intensity can be calculated at the following formula

H = (1 + C.t F ant0)/n (t + b)

Type of h - storm (rain) intensity (mm/min)

T0 - design return period (a)

T - rainfall duration (min)

F, C, b, n - local rainfall parameters.


The membrane surface drainage slope demand is greater than the general construction. Slope more than 15 ~ 20% flat membrane, hyperboloid ridge (curvature) should be greater than 10%. At the same time the membrane surface tension 1.0 ~ 2.0 KN/m above, avoid membrane in the rain under the action of large deformation, so as to produce water, dripping water on the membrane surface. Membrane area of water has Matthew efficiency characteristics, water will lead to partial concave deformation, concave deformation in turn aggravate water phenomenon. Enough slope, curvature and the tension level is the necessary condition to ensure catchment is smooth. Water board (for stainless steel, aluminum plate, membrane belt), gutters, downspouts design should be coordinated with membrane node structure design.



Key words:
Relevant information

Service Hotline0755 27809070

Shenzhen: 2nd floor Huizhou, Baoan Xixiang Baoyunda Logistics Research and Development Center, Shenzhen: 8th floor, Block B, Jinhaoyuan Building, Huiyang District, Huizhou City, Guangdong Province
Email: folan@sz1680.com
Copyright 2018 Shenzhen Folan Space Membrane Structure Co., Ltd. all rights reserved.
Guangdong ICP prepare No. 18128411 -1
Technical support: 國人在線 Disclaimer Website map

WeChat 2D code

伊人大香蕉毛片| 国产69精品久久久久999小说| 天天爽天天| 日本综合久| 99干视频| 婷婷丁香色情| 狠狠搞五月天| 五月激情丁香五月宗合| 久久这里只有精品07| 五月丁香六月婷婷精品| 激情综合网丁香| 五月天天天开心激情网| 日本成人噜噜| 十月丁香九月婷婷综合| 激情网综合| 无码色色| 天天精品视频免费观看| 五月丁香五月综合欧美| 色播五月天激情| 茄子成视频人app污 | 九九性视频| 青青草视频免费观看| 午夜精品久久久久久久爽| 国产男女性无套 免费网站| 人人爱人人摸性爱视频| 人人操人人玩人人干人人| 特操美逼| 无人区码卡二卡乱码字幕| 日本在线不卡免费视频| 久青草影院|